Independently of the size of the hydropower station and of the turbine model F.EE with tested control engineering realizes high efficacies. Through the commitment of reliable tax and rule technique we guarantee high availability.
Safeguarding against failure, teleservicing and failure recording are orders which we surely make with the aid of SPS-controls and user-friendly operating panels or personal computer visualization.
F.EE realizes switching and control plants for turbine services of 10 kilowatts to 5 MW. We supply our compact system up to 90 kilowatts of turbine service (Switching and control technique including compensation and hydraulics).
According to utilization F.EE supplies adjusted hydraulic pumps of the compact solution up to the redundant carrying out for big plants to the control.
Through the commitment of high-quality standard components from the industry (Siemens, ABB ...) a long-standing repair part supply is safeguarded.
The quality control requirement in the house F.EE is very high. The complete control engineering (Control box, hardware and software) is subjected to an intense functional test before the delivery in the test panel at the simulator. The commissioning times are reduced around more than 50 % by that. So far when possibly our control concept plans standardized and prefabricated control lines, this reduces the erecting time considerably.