Hydropower projects

Höllenstein, Germany

Two power plants have already been automated for Kraftwerk am Höllensteinsee AG: Höllenstein and Pulling at Blaibacher See. As the general contractor, F.EE was responsible for the replacement of the hydraulic turbine controllers.

Project data

Höllenstein power plant:

  • Head: 12.5 metres.
  • Flow rate: 3 x 12.1 m³/s.
  • Turbines: 3 x Francis shaft, each 1250 kVA.
  • Control: 3 x S7-300.

Pulling power plant:

  • Drop height: 7.0 metres.
  • Flow rate: 2 x 12.0 m³/s.
  • Turbines: 2 x Kaplan spiral 595 kW.
  • Control: 2 x S7-300.

Control cabinet construction

All hydropower control cabinets are produced in our own production centre in Neunburg v. W.