Hydropower projects

Namazgah, Turkey

General contractor assignment including turbine technology.

Project data

  • Head: 27.1 metres.
  • Flow rate: 2 x 3.5 m³ /s.
  • Turbines: 2 x Kaplan spiral, each 839 kW.
  • Control: S7-1500.
  • Visualization: fe.screen-view.

Control cabinet construction

All hydropower control cabinets are produced in our own production centre in Neunburg v. W.

To control cabinet construction

Mitarbeiter Schaltschrankverdrahtung

Contact us

We will be pleased to advise you and answer your request!

Your contact

Markus Breitschaft, Power engineering sales