Rukarara, Rwanda
General contractor assignment including infrastructure, structures and turbines.
Project data
- Head: 50.7 metres.
- Flow rate: 2 x 2.6 m³ per second.
- Turbines: 2 x Francis spiral, each 1,078 kW.
- Control: S7-300.
- Visualization: fe.screen-view.