Hydropower projects

Rukarara, Rwanda

General contractor assignment including infrastructure, structures and turbines.

Project data

  • Head: 50.7 metres.
  • Flow rate: 2 x 2.6 m³ per second.
  • Turbines: 2 x Francis spiral, each 1,078 kW.
  • Control: S7-300.
  • Visualization: fe.screen-view.

Control cabinet construction

All hydropower control cabinets are produced in our own production centre in Neunburg v. W.

To control cabinet construction

Mitarbeiter Schaltschrankverdrahtung

Contact us

We will be pleased to advise you and answer your request!

Your contact

Markus Breitschaft, Power engineering sales